• THE REPUBLIC OF TURKEY THE PRE-FEASIBILITY STUDY ON THE DİKİLİ BERGAMA GEOTHERMAL DEVELOPMENT PROJECT FINAL REPORT

PREFACE
        In response to the request of the Government of the Republic of Turkey, the Japanese Government decided to conduct a survey on the Dikili-Bergama Geothermal Development Project and Entrusted the survey to the Japan International Cooperation Agency. The JICA sent to Turkey a survey team headed by Mr. Yasuhiko Ejima of West Japan Engineering Consultants Inc., three times from June. 1987 to November, 1987.
        The team, with the cooperation of the officials concerned of the Government of Turkey, conducted a field survey on geology, geochemistry, geophysics and heat flow with a view to assessing geothermal potentiality in the Dikili-Bergama Area. After the team returned to Japan, further studies were made and the present report has been prepared.
        I hope that this report will serve for the geothermal development in Turkey and contribute to the promotion of friendly relations between our two countries.
        I wish to express my deep appreciation to the officials concerned of the Government of the Republic of Turkey for their close cooperation extended to the team.

December 1987
Keisuke Arita
President
Japan International Cooperation Agency

Rapor Özellikleri
Rapor No 8333
Rapor Adı THE REPUBLIC OF TURKEY THE PRE-FEASIBILITY STUDY ON THE DİKİLİ BERGAMA GEOTHERMAL DEVELOPMENT PROJECT FINAL REPORT
Konu JEOTERMAL ENERJİ-GEOTHERMAL ENERGY
Yer - Konum İZMİR İZMİR-BERGAMA-DİKİLİ
Dil İNGİLİZCE
Yayın Tarihi 01.12.1987
Hazırlayan Birim ENERJİ HAMMADDE ETÜT VE ARAMA DAİRESİ BAŞKANLIĞI
Yazarlar -

THE REPUBLIC OF TURKEY THE PRE-FEASIBILITY STUDY ON THE DİKİLİ BERGAMA GEOTHERMAL DEVELOPMENT PROJECT FINAL REPORT

  • Markalar MTA
  • Ürün Kodu: DR08333
  • Stok Durumu: Stokta var
  • 1.320,00TL


Etiketler: BERGAMA, DİKİLİ, GEOTHERMAL ENERGY, İZMİR, JEOTERMAL ENERJİ, 8333